{"id":12663,"date":"2024-06-11T15:16:22","date_gmt":"2024-06-11T15:16:22","guid":{"rendered":"https:\/\/buildingindonesia.co.id\/?p=12663"},"modified":"2024-06-26T04:36:34","modified_gmt":"2024-06-26T04:36:34","slug":"cornerstone-laid-at-ulemiste-passenger-terminal","status":"publish","type":"post","link":"https:\/\/buildingindonesia.co.id\/id\/cornerstone-laid-at-ulemiste-passenger-terminal\/","title":{"rendered":"Cornerstone Laid at \u00dclemiste Passenger Terminal"},"content":{"rendered":"<p>Marking the start of construction works, the cornerstone has been laid at the site of the new \u00dclemiste Passenger Terminal in Tallinn.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/pPn6S6t\/1.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>A multi-modal transport hub for the city\u2019s commuters as well as international rail passengers and air travellers using the adjacent Tallinn Airport, the \u00dclemiste Passenger Terminal is designed as a connecting bridge linking together districts of Tallinn currently separated by the railway tracks that disect the city.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/WBqXv28\/2.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Opening in 2028, Tallinn\u2019s \u00dclemiste terminal will be the northern terminus of the new 870-kilometre Rail Baltica electrified railway now under-construction. Providing passenger services at speeds up to 249km\/h, Rail Baltica will connect Estonia, Latvia and Lithuania with the European high-speed rail network in Poland.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/j4v1ZwT\/3.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Zaha Hadid Architects developed the design with leading Estonian architecture and engineering firm Esplan. Circulation routes through the terminal have determined the station&#8217;s spatial geometry to aid navigation and the seamless integration of the city&#8217;s bus, tram, rail and cycle networks that intersect at the terminus.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/m885B4h\/4.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Incorporating a modular structural system built in phases to enable ongoing operations on the rail lines throughout construction, the terminal has been designed and planned to BREEAM benchmarks and guidelines.<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/FmzcSv6\/5.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Estonia\u2019s Climate Minister, Kristen Michal, said: &#8220;We have been dreaming of a fast connection to Europe. This is a landmark year in the construction of Rail Baltica \u2013 in addition to laying the cornerstone of the \u00dclemiste terminal, the construction of the main line has also begun. Building a high-quality connection will provide a much-needed new opportunity for the Estonia\u2019s people and its economy.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/GJdTytS\/6.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Director-General of the European Commission&#8217;s Directorate-General for Mobility, Magda Kopczynska, said: &#8220;Rail Baltica is a European, Baltic and Estonian project. The Baltic States must be connected to the European rail network, both in order to ensure the security of supply chains, comfortable travel, economic development and, last but not least, our common European security. The European Commission has been and will remain a strong supporter of Rail Baltica.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/kcMsJyt\/7.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p>Chairman of the Rail Baltic Estonia management board, Anvar Salomets, said: &#8220;Until just a few years ago, we could not have believed that we could have celebrated the laying of the cornerstone for \u00dclemiste Terminal. The implementation of the Rail Baltica project in Estonia has been both effective and efficient, and in four years&#8217; time, we invite everyone to the opening of Rail Baltica \u00dclemiste terminal.&#8221;<\/p>\n\n\n\n<figure class=\"wp-block-image size-large\"><img src=\"https:\/\/i.ibb.co.com\/qgJ7Lzd\/8.jpg\" alt=\"\"\/><\/figure>\n\n\n\n<p><strong>Project Team<br>Competition Stage<br>Architect<\/strong>: Zaha Hadid Architects (ZHA)<br><strong>ZHA Board Director<\/strong>s: Patrik Schumacher, Gianluca Racana<br><strong>ZHA Project Directors<\/strong>: Ludovico Lombardi, Michele Salvi<br><strong>ZHA Design Team<\/strong>: Luciano Letteriello, Kate Revyakina, Serra Pakalin, Yuzhi Xu, Anthony Awanis, Hendrik Rupp, Mauro Sabiu<\/p>\n\n\n\n<p><strong>Design Stages<br>Architect<\/strong>: Zaha Hadid Architects<br><strong>ZHA Board Directors<\/strong>: Patrik Schumacher, Gianluca Racana<br><strong>ZHA Project Directors<\/strong>: Ludovico Lombardi, Michele Salvi<br><strong>ZHA Project Leads<\/strong>: Luciano Letteriello, Marco Guardincerri<br><strong>ZHA Design team<\/strong>: Zrinka Radic, Amittai Antoine, Richard Maekallas, Davide del Giudice, Alexsandra Fisher, Jose Navarrete Deza, Mauro Sabiu, Adam Twigger<\/p>\n\n\n\n<p><strong>Consultants<\/strong><br><strong>Local Architect<\/strong>: Esplan OU<br><strong>Engineering<\/strong>: Esplan OU<br><strong>Render<\/strong>: Negativ<\/p>","protected":false},"excerpt":{"rendered":"<p>Marking the start of construction works, the cornerstone has been laid at the site of the new \u00dclemiste Passenger Terminal in Tallinn. A multi-modal transport hub for the city\u2019s commuters as well as international rail passengers and air travellers using the adjacent Tallinn Airport, the \u00dclemiste Passenger Terminal is designed as a connecting bridge linking [&hellip;]<\/p>","protected":false},"author":1,"featured_media":12664,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":[],"categories":[14],"tags":[],"_links":{"self":[{"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/posts\/12663"}],"collection":[{"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/comments?post=12663"}],"version-history":[{"count":5,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/posts\/12663\/revisions"}],"predecessor-version":[{"id":13407,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/posts\/12663\/revisions\/13407"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/media\/12664"}],"wp:attachment":[{"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/media?parent=12663"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/categories?post=12663"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/buildingindonesia.co.id\/id\/wp-json\/wp\/v2\/tags?post=12663"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}